The assessment of the Effectiveness of the Implementation of Infrastructural Investments within the Regional Operational Programme for the Podkarpackie Province Throughout 2007-2013

Assessment of the consequences of investments in the infrastructure of Podkarpackie Voivodeship, which were carried out within the framework of the Regional Operational Program for 2007-2013. Indicators of project implementation: product-result ratio.

Рубрика География и экономическая география
Вид статья
Язык английский
Дата добавления 22.06.2022
Размер файла 297,6 K

Отправить свою хорошую работу в базу знаний просто. Используйте форму, расположенную ниже

Студенты, аспиранты, молодые ученые, использующие базу знаний в своей учебе и работе, будут вам очень благодарны.

Размещено на http://www.allbest.ru/

The assessment of the Effectiveness of the Implementation of Infrastructural Investments within the Regional Operational Programme for the Podkarpackie Province Throughout 2007-2013

Wojciech Lichota

This article aims to assess the effects of the implementation of infrastructural investments within the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013. The article was prepared based on the examination method of documents that included the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013, the Annual Report (for 2014) and Periodical Report (for the second half of 2015) on the implementation of the Programme, Monitor Regionalny, The report - the situation at the end of July 2015. The conducted analysis shows that most assumed material project indicators, i.e. output and result indicators, were achieved. As a result of the implementation of the Programme 924 km of regional roads were modernized, 76 km of regional roads were built, 107 units of municipal transport fleet were purchased and modernized, a 58 km broadband network was built, 13 406 entities have gained access to the broadband Internet, 157 units of fire engines were purchased within the projects in the field of the protection against forest fires and other threats, 190 369 persons were connected to the water supply network, 78 343 persons were connected to the sewage system, 59 educational facilities were modernized, 20 lifelong learning schools were supported, 26 health care centres were modernized, 19 social welfare institutions were modernized, and 40 sports and leisure facilities were built. It is worth noting that by the end of July 2015, projects using all available allocation of funds were contracted and the beneficiaries of the Programme were paid more than 94% of the funds within the available allocation, which puts the Pod- karpackie Province on the third place on the background of the country.

Keywords: EU funds, European funds, structural funds, regional programmes, the European Regional Development Fund, Podkarpackie Province.

Оцінка ефективності реалізації інвестицій в інфраструктуру в рамках Регіональної операційної програми Підкарпатського воєводства на 2007-2013 роки

Метою статті є оцінка наслідків реалізації інвестицій в інфраструктуру Підкарпатського воєводства, які здійснювалися у рамках Регіональної операційної програми на 2007-2013 роки. Стаття була приготована на основі методу вивчення документів, зокрема таких як: Регіональна операційна програма Підкарпатського воєводства на 2007-2013 роки, річний звіт (за 2014 р.) та періодичний звіт (за ІІ півріччя 2015 р.) про виконання Програми, Регіональний моніторинг, Рапорт - станом на кінець липня 2015 р. Як показує проведений аналіз, досягнуто більшість закладених істотних показників реалізації проекту, тобто показники продукту та результату. Як наслідок виконання Програми, зокрема модернізовано 924 км регіональних доріг, побудовано 76 км доріг регіонального значення, придбано та модернізовано 107 одиниць техніки для автопарку міського транспорту, побудовано 58 км широкосмугової мережі Інтернет, 13 406 суб'єктів отримали доступ до широкосмугової мережі Інтернет, в рамках проектів протипожежних заходів в лісових масивах та інших загроз придбано 157 одиниць пожежного транспорту, до водопровідної мережі під'єднано 190 399 осіб, до каналізаційної мережі під'єднано 78 343 особи, модернізовано 59 освітніх об'єктів, надано підтримку 20 закладам безперервної освіти, модернізовано 26 закладів охорони здоров'я, модернізовано 19 закладів соціального захисту DrWojciechLichota, Department of Finances, Faculty of Economics, University of Rzeszow, The Republic of Poland населення, побудовано 40 спортивно-оздоровчих закладів. Варто зазначити, що до кінця липня 2015 р. було укладено договори щодо проектів на всю доступну виділену суму коштів та було виділено бенефіціарам Програми понад 94% коштів в рамках доступних асигнувань, що надає Підкарпатському воєводству третє місце в масштабах держави.

Ключові слова: фонди Європейського Союзу, Європейські фонди, структурні фонди, регіональні програми, Європейський фонд регіонального розвитку, Підкарпатське воєводство.

OcenaefektywnosciwdrazniainwestycjiinfrastrukturalnychwramachRegionalnegoProgramuOperacyjnegoWojewodztwaPodkarpackiegonalata 2007 - 2013

Celemartykulu jest ocenaefektowwdrazaniainwestycjiinfrastrukturalnych w ramachRegionalnegoProgramuOperacyjnegoWojewodztwaPodkarpackiegonalata 2007-2013. Artykulzostalprzygotowany w oparciu o metodqbadaniadokumentowjakimibyly w szczegolnosci: Regionalny Program OperacyjnyWojewodztwaPodkarpackiegonalata 2007-2013, Sprawozdanieroczne (za 2014 r.) iokresowe (za II polrocze 2015 r.) z realizacjiProgramu, Monitor Regionalny, Raport - stannakonieclipca 2015 r. Jakwynika z dokonanejanalizywiqkszosczalozonychrzeczowychwskaznikowrealizacjiprojektu, tj. wskaznikowproduktuirezultatuzostaloosiqgniqtych. W wynikurealizacjiProgramu, m.in. zmodernizowano 924 km drogregionalnych, wybudowano 76 km drogregionalnych, zakupionoizmodernizowanego 107 szt. taborukomunikacjimiejskiej, wybudowano 58 km sieciInternetuszerokopasmowego, dostqp do szerokopasmowegoInternetuuzyskalo 13 406 podmiotow, zakupiono 157 szt. wozowpozarniczych w ramachprojektow w zakresiezabezpieczeniaprzedpozaramilasowiinnymizagrozeniami, przylqczono do sieciwodociqgowej 190 369 osob, przylqczono do siecikanalizacyjnej 78 343 osoby, zmodernizowano 59 obiektowedukacyjnych, wsparto 20 placowekprowadzqcychdzialalnosc w zakresieksztalceniaustawicznego, zmodernizowano 26 zakladowopiekizdrowotnej, zmodernizowano 19 obiektowpomocyspolecznej, wybudowano 40 obiektowsportowychlubrekreacyjnych. Wartopodkreslic, ze do koncalipca 2015 r. zakontraktowanoprojektynacalqdostqpnqalokacjqsrodkowiwydatkowanonarzeczbeneficjentowProgramuponad 94 % srodkow w ramachdostqpnejalokacji, co stawiawojewodztwopodkarpackienatrzecimmiejscunatlekraju.

Slowakluczowe: funduszeunijne, funduszeeuropejskie, funduszestrukturalne, programyregionalne, EuropejskiFunduszRozwojuRegionalnego, wojewodztwopodkarpackie.

Introduction

The Regional Operational Programme for the Podkarpackie Province for the years 2007-2013 (ROP WP programme) is the most important instrument of the regional development policy for the period 2007-2015 As part of the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013, the expenses incurred by the end of 2015 may be considered as an eligible cost of the projects.. The overall objective of ROP WP programme is the growth of domestic and international competitiveness of the economy and the improvement of the spatial accessibility of the Pod- karpackie Province J. Sierak, A. Karasek, O. Korniienko, A. Godlewska, A. Lubian, M. Sienicki, A. Boczkowska, A. Kucyk, Efektywykorzystaniadotacjiunijnych w ramachRegionalnychProgramowOperacyjnych w latach 2007-2013, Cz. 2, WojewodztwaPolskiWschodniejiCentralnej, OficynaWydawniczaUczelniLazarskiego, Warszawa 2016, p. 49.. This goal is achieved through structural investments aimed at, among others, enhancing the accessibility of the region, increasing its competitiveness, promoting innovation, improving the natural and cultural environment, and raising the level of education. The specific objectives of ROP WP programme The Regional Operational Programme for the Podkarpackie Province for the years 2007-2013 adopted by the Board of Podkarpackie Province on 10 January 2012, p. 4. were determined based on an analysis of the level of socio-economic development of the province and cover the most important areas of intervention that require support in order to remove the main barriers to development and raise the level of economic development of the prov-

ince W. Karpinska-Mizielinska, T. Smuga (red.), 2015, Wpfywinterwencji z funduszyunijnych,CeDeWu, Warszawa, p.157..

The Regional Operational Programme for the Podkarpackie Province for the years 2007-2013 set eight priority axes.

The overriding objective set for axis I.: Competitive and Innovative Economy is to create conditions for the development of entrepreneurship and economy based on knowledge. The achievement of this objective will be carried out through the following specific objectives:

- the support for the development of the existing enterprises and the creation of new ones,

- the increase in the availability of external sources of financing,

- the development of a network of business environment institutions,

- the creation of the conditions for economic development and growth of the innovation potential in the region and the transfer of knowledge,

- the increase in the investment attractiveness and the support of activities in the field of interregional and international cooperation.

Implementation of axis II. Technical Infrastructure will improve the accessibility and investment attractiveness of the region through the implementation of projects in the sphere of transport and energy.

The specific objectives identified under axis II. include:

- the improvement of transport links and public transport system in the province,

- the improvement of the condition and efficient use of energy infrastructure.

The creation of the conditions for development of information society in the region is realized under axis III: Information Society. The improvement of the quality of information infrastructure will allow closing significantly the gap between the region and the more developed regions of the country and the European Union.

The prevention of environmental degradation and natural and technological hazards, as well as the effective management of natural resources are the overriding objective of axis IV. Environmental Protection and Risk Prevention.

The implementation of this objective will contribute:

- water supply,

- to improve flood protection and to manage water resources in a rational manner,

- to reduce the degradation of the environment and to conserve the biological diversity,

- to improve the level of security in the region in terms of natural and technological hazards.

The objective of axis V.: Public Infrastructure is to create the conditions for the development of social capital through investments in education, health care, social welfare, sports and recreation.

The specific objectives identified under this axis include:

- the improvement of the accessibility and quality of the regional education system,

- the improvement of health security and the development of social welfare infrastructure,

- the increase in the availability of residents to sports and recreational facilities.

The increase in the share of tourism in the regional economy and the protection of cultural heritage and the development of cultural institutions will be ensured by the implementation of axis VI. Tourism and Culture. Particularly so, since the province has a significant but unused potential both in the area of tourism and culture.

The reduction of disparities in development within the region by strengthening urban centres, the socio-economic recovery of degraded areas and the increase in the investment attractiveness of economically marginalized areas will be carried out through the implementation of activities planned under axis VII. Intra-Regional Cohesion.

Implementation of axis VIII. Technical Assistance, is aimed at the effective implementation of ROP WP programme, including:

- enabling the efficient functioning of the programme implementation system and ensuring the continuity of programming,

- disseminating information about available support within the Regional Operational Programme for the Podkarpackie Province and promoting the effects of the programme,

- ensuring the correct preparation of projects in order to improve their implementation,

- full participation in a uniform computerized monitoring system A detailed description of the priorities of the Regional Operational Programme for the Podkarpackie Province for the years 2007 - 2013 of 15 April 2014, pp. 4-5..

This article will assess the implementation of the Regional Operational Programme for the Pod- karpackie Province for the years 2007-2013 in terms of the infrastructure, i.e. under axes II-VII.

Since the first calls for projects were announced in 2008 and the contracting of projects started in 2008, the majority of the projects that received funding have already been completed and settled. It should be noted that the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013 has now entered its final phase of implementation because the calls for applications are no longer expected to be carried out Annex to Resolution No. 328/7836/14 of the Board of the Podkarpackie Province in Rzeszow of 11 March 2014., almost the entire allocation of the funds available under the ROP WP programme was contracted Annual Report on the implementation of the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013 for 2014, p. 6 and the Use of EU funds under the National Cohesion Strategy 2007-2013, Warsaw, July 2015., and the final date of the expenditure eligibility is 31 December 2015 [Manual of expenditure eligibility under the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013, September 2014, p. 11.

Chart 1 presents the amounts allocated to the implementation of individual ROP WP programme axes.

Chart 1.The system of priority axes of ROP WP programme (ERDF allocation in millions EUR)

Source: Periodical Report on the implementation of the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013for the second half of 2015.

Axis I - Competitive and Innovative Economy - 306.88 millions EUR, Axis II - Technical Infrastructure - 378.41 millions EUR, Axis III - Information Society - 67.99 millions EUR, Axis IV - Environmental Protection and Risk Prevention - 170.45 millions EUR, Axis V - Public Infrastructure - 127.36 millions EUR, Axis VI - Tourism and Culture - 37.07 millions EUR, Axis VII - IntraRegional Cohesion - 79.54 millions EUR, Axis VIII - Technical Assistance - 31.09 millions EUR.

Financial and material effects of the implementation of the individual axes II to VII of the Regional Operational Programme for the Podkarpackie Province Based on the Periodical Report on the implementation of the Regional Operational Programme for the Pod- karpackie Province for 2007-2013 for the second half of 2015.

The material effects of the implementation of the Programme are measured by product indicators that relate to the direct effects of the implementation of the project (e.g. 2 km of a road, 3 buildings) and outcome indicators that characterize the impact of the completed project on the environment, obtained immediately after its completion (e.g. shortening of the travel time from village A to village B in connection with the modernization of a road, or the amount of energy savings as a result of the thermal modernization of a building).

The effects presented in the article will therefore have a direct reference in the form of indicators achieved.

Under axis II. Technical Infrastructure, since the launch of the Programme, 462 projects (including 27 key projects) were contracted for the amount of 1 622 798 975.81 zl of the ERDF, which represents 100% of the allocation of axis II.: Technical Infrastructure. The amount of 1 516 485 067.56 zl of the ERDF was approved and disbursed, which represents 93% of the allocation of axis II.

Under the above mentioned priority axis:

- over 76 km of new roads were built (67.2 km of municipal and district roads and 9.5 km of provincial roads)

- 924 km of roads were modernized (882.5 km of municipal and district roads and 41.5 km of provincial roads)

- 23.6 km of roads damaged by flooding were reconstructed,

- 75 km of railway lines were reconstructed,

- 107 units of municipal transport fleet were purchased and modernized11,

- additional power of renewable energy was installed, which amounted to 23.6MW,

- 5 units of rolling stock were purchased.

However, the following indicators will not be achieved, e.g.

- The number of passenger kilometres in the purchased / modernized public transport fleet (0.86%),

- The length of new railway lines (0%),

- The amount of purchased rolling stock (45%),

- The length of new regional (provincial) roads (47%),

- The length of reconstructed regional (provincial) roads (41%) W. Lichota, Wykorzystaniefunduszy UE w ramachperspektywy 2007-2013 a mozliwoscipozyskaniasrodkow w ramachperspektywy 2014-2020 naprzykladziewybranejgminy z wojewodztwapodkarpackiego,NierownosciSpoleczne a WzrostGospodarczy, nr 49 (1/2017), s. 254. The percentage level of achievement of the target value for 2015 according to the signed contracts is given in brackets.,

because they were overestimated at the stage of the Programme creation, projects that allow achieving these indicators were not submitted for funding or a diagnosis was confirmed that there is a good road network in the Podkarpackie Province, so there is no need to build new roads but the existing ones must be modernized.

Under axis III: Information Society, 60 agreements / decisions (including contracting 24 key projects) were signed for 280 607 522.7 zl of the ERDF, which represents 100% of the allocation amount of axis III. The amount of 237 876 181.25 zl of the ERDF was approved and disbursed, which represents 84% of the allocation of axis III.

Under the above mentioned priority axis:

- 58.7 km of the broadband internet network were built,

- 360 public services were delivered on-line,

- 52 077 persons gained access to the broadband internet, including 38 577 persons in rural areas,

- 13 406 entities (households - 12 300, SMEs - 1095, schools - 10, public administration entities - 1) gained access to the broadband internet,

- The number of users of on-line services amounted to 9 392 452 persons.

- However, the following indicators will not be achieved, e.g.

- The number of entities that gained access to the broadband internet, including schools (37%),

- The number of entities that gained access to the broadband internet, including public administration entities (8%) W. Lichota, Op. cit.,

because the projects that allow for the completion of specified indicators were not submitted.

Under axis IV. Environmental Protection and Risk Prevention, 256 projects (including 4 key projects) were contracted for the amount of 692 449 815.14 zl of the ERDF, which represents 100% of the allocation amount of axis IV. The amount of 664 355 135.25 zl of the ERDF was approved and disbursed, which represents 96% of the allocation of axis IV.

Under the above mentioned priority axis:

- 669 km of water networks were built, including 584 km in rural areas,

- 1547 km of sewerage networks were built, including 1518 km in rural areas,

- 157 units of fire engines were purchased within the projects in the field of protection against forest fires and other hazards,

- 190 369 persons were connected to the water supply network,

- 78 343 persons were connected to the sewage system,

- selective waste collection system was made for 134 344 persons,

- 43 282 persons were protected against flooding,

- 1 791 companies were protected against flooding,

- 17 564 ha of the area were protected against flooding,

- 326 654 persons were covered by projects involving waste management,

- 25 km of flood embankments were built / modernized,

- 92 pieces of buildings / flood control facilities other than embankments and drainage buildings / facilities were built / modernized,

- 46 km of watercourses were subjected to regulations or other drainage works,

- 20 endangered species were covered by protective measures,

- 9 500 ha of habitats were covered by monitoring,

- 35 million zl was the value of the property protected against the risk of landslides.

The following indicators will not be achieved, e.g.:

- The number of projects in the field of waste management (41%),

- The area of reclaimed land because of the projects (57%),

- The number of residents served within projects related to waste management (38%),

- The length of built / modernized flood embankments (65%),

- The number of people protected from flooding because of the projects (43%),

- The number of projects related to natural inventory, development of conservation plans for NATURA 2000 sites, landscape parks and nature reserves (60%),

- The number of projects in the field of the conservation of natural habitats, species of plants, animals and fungi (50%),

- The number of projects involving the construction of wildlife crossings and / or the elimination of environmental barriers (0%),

- The size of the area covered by the impact of the projects (4.58%) W. Lichota, Ор. cit..

The failure to reach the specified indicators is associated with considerable difficulties in preparing and implementing of this scope projects and with less efficiency of the projects in relation to the assumptions. The lack of projects on wildlife crossings may be because of the fact that specific areas that need this type of action have not yet been identified in the Podkarpackie Province.

Under axis V.: Public Infrastructure, 221 agreements / decisions (including 16 key projects) were signed for 529 618 849.82 zl of the ERDF, which represents 100% of the allocation available under axis V: Public Infrastructure. Applications for payment were approved, under which beneficiaries were paid the amount of 509 702 714.98 zl of the ERDF, which represents 96% of the allocation of axis V.

Under the above mentioned priority axis:

- 59 educational facilities were modernized,

- 20 lifelong learning schools were supported,

- 37 318 pupils and 21 443 students benefited from the effects of the projects,

- 2 316 children attend the built or modernized rural kindergartens,

- 352 982 patients per year benefit from the effects of the projects involving healthcare,

- 470 230 specialised medical examinations were conducted using the equipment purchased as a result of the projects,

- 29125 persons benefit from the effects of the projects involving social assistance,

- 26 health care facilities were modernized,

- 19 social assistance facilities were modernized,

- 40 sports and leisure facilities were built,

- 19 sports and leisure facilities were equipped,

- 7 sports and leisure facilities damaged by the flood were rebuilt / renovated.

The indicator “The number of modernized social assistance facilities” will not be achieved (51%) W. Lichota, Ор. cit., because an insufficient number of projects which include the modernization of social assistance facilities was submitted.

Under axis VI. Tourism and Culture, 72 agreements / decisions (including contracting 3 key projects) were signed, for a total amount of 148 572 727.64 zl of the ERDF, which represents 100% of the allocation of axis VI: Tourism and Culture. Applications for payment were approved, under which beneficiaries were paid the amount of 144 616 057.35 zl of the ERDF, which represents 97% of the allocation of axis VI.

Under the above mentioned priority axis:

- 81 cultural institutions were supported,

- 53 workplaces in tourism were created,

- 76 cultural heritage sites were opened to tourism.

Under axis VII. Intra-Regional Cohesion, 143 contracts (including contracting 1 key project) were signed for the amount of 323 798 383.55 zl of the ERDF, which represents 100% of the allocation of axis VII: Intra-Regional Cohesion. Applications for payment were approved, under which beneficiaries were paid the amount of 310 915 049.39 zl of the ERDF, which represents 96% of the allocation of axis VII.

Under the above mentioned priority axis:

- 630 469 sq. m of buildings were renovated,

- 14 companies were founded in the renovated areas,

- 74 workplaces were created in the renovated areas,

- the infrastructure damaged by the flood, worth 54.9 million zl, was reconstructed.

The following indicators will not be achieved, e.g.

- The number of companies established in the renovated areas (activity 7.2 - 14%),

- The number of workplaces created in the renovated areas (activity 7.2 - 58%),

- The number of projects promoting entrepreneurship and the use of new technologies (activity 7.3 - 17%),

- The number of companies established in the renovated areas (activity 7.3 - 0%)15 Ibidem.,

Most likely, these indicators were overestimated at the stage of the Programme creation.

The status of implementation of the Regional Operational Programme for the Podkarpack- ie Province for the years 2007-2013 against the background of the country

By the end of July 2015, within 16 regional programmes 36.2 thousand agreements on funding were signed for the amount of 110.9 billion zl, including EU funding - 71.3 billion zl. (see chart 2).

Chart 2.Contracting of individual ROP programmes - the value of the contracts (EU funds, million zl) and the use of the allocation (%).

Source: Monitor Regionalny, The report - situation at the end of July 2015. Together 16 RPO programmes: the value of the contracts (EUfunds) - 71.3 billion zl, contracting - 99.6%

Thus, 99.6% of EU funds available under the regional programmeswere allocated. The expenditure declared by the beneficiaries in the applications for payment exceeded 99.1 billion zl, including EU funding - approx. 63.8 billion zl, which represents 89.1% of the allocation of the funds for 16 regional operational programmes (see chart 3) Monitor Regionalny, The report - situation at the end of July 2015..

Chart 3.Spending in each ROP programme - the value of the applications for payment (EU funds, million zl) and the use of the allocation (%).

Source: Monitor Regionalny, The report - situation at the end of July 2015.

Together 16 RPO programmes: the value of the applications for payment (EU funds) - 63.8 billion zl, spending - 89%.

According to the data presented in chart 2, the Podkarpackie Province makes a very good use of the allocation of the funds allocated to the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013. By the end of July 2015, within the mentioned Programme 4 936 contracts for project financing were signed and thus the entire allocation of the funds was used. Due to the fact that several dozens of projects are still being implemented in which the final payment has not yet been paid, as a consequence of the resulting post-tender savings, the savings resulting from the final settlement of the investments, and accrued financial corrections, some additional funds can be released which ultimately can fund the Programme budget and be allocated for financing new projects.

It should also be noted that in terms of the level of payments settlement (94%) - chart 3, the Pod- karpackie Province was ranked third in the country.

Conclusions

The implementation of the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013 is coming to the end. All projects under axes II-VII were contracted, the funds are being settled, and the proper implementation of projects is being verified. Most of the assumed indicators of the material implementation were achieved, though there are such indicators that will not be achieved fully or even at all. This is because of the fact that no projects were submitted or too few projects were submitted through which it would be possible to achieve the target values. Moreover, some indicators assumed to be implemented were overestimated at the stage of the program documents creation.

It should be noted that the Podkarpackie Province made a very good use of the ROP programme funds. Given the amount of the funds paid and settled in relation to the limit of available funds within the whole ROP programme, i.e. 94%, the Podkarpackie Province ranks as the third on the background of the whole country Ibidem..

The effects of the material implementation of the projects in the form of renovated roads, the modernization of public transport, airport infrastructure, educational, social assistance, sports, and recreation facilities, cultural institutions, or the construction of environmental infrastructure are evident in almost every municipality of the Podkarpackie Province.

References

investment podkarpackie voivodeship

1. A detailed description of the priorities of the Regional Operational Programme for the Podkarpackie Province for the years 2007-2013 of 15 April 2014.

2. Annex to Resolution No. 328/7836/14 of the Board of the Podkarpackie Province in Rzeszow of 11 March 2014.

3. Annual Report on the implementation of the Regional Operational Programme for the Pod- karpackie Province for 2007-2013 for the year 2014.

4. Karpinska-MizielinskaW., SmugaT. (red.), Wplywinterwencjizfunduszyunijnychnafunkcjonowanieprzedsi^biorstwiich konkurencyjnosc, CeDeWu, Warszawa 2015.

5. Kornberger-Sokolowska E. (red.), Jednostkisamorz^duterytorialnegojakobeneficjencisrodkoweuropejskich, Wolters Kluwer Polska, Warszawa 2012.

6. LichotaW., WykorzystaniefunduszyUEwramachperspektywy 2007-2013 amozliwoscipozyskaniasrodkowwramachperspektywy 2014-2020 naprzykladziewybranejgminyzwojewodztwapodkarpackiego, NierownosciSpoleczneaWzrostGospodarczy, nr 49 (1/2017).

7. Manual of expenditure eligibility under the Regional Operational Programme for the Pod- karpackie Province for the years 2007-2013, September 2014.

8. Monitor Regionalny, The report - situation at the end of July 2015.

9. Periodical Report on the implementation of the Regional Operational Programme for the Pod- karpackie Province for 2007-2013 for the second half of 2015.

10. SierakJ., KarasekA., KorniienkoO., GodlewskaA., LubianA., SienickiM., BoczkowskaA., KucykA., EfektywykorzystaniadotacjiunijnychwramachRegionalnychProgramowOperacyjnychwlatach 2007-2013, Cz. 2, WojewodztwaPolskiWschodniejiCentralnej, OficynaWydawniczaUczelniLazarskiego, Warszawa 2016.

11. The Regional Operational Programme for the Podkarpackie Province for the years 2007-2013 adopted by the Board of Podkarpackie Province on 10 January 2012.

12. The use of EU funds under the National Cohesion Strategy 2000-2013, Warsaw, July 2015.

Размещено на Allbest.ru

...

Подобные документы

  • The Province of Quebec. The use of French customary law ("Coutume de Paris") in private matters. Access to the Ohio and Illinois Countries. The trade and military routes across the Great Lakes. Governors of the Province of Quebec. Coat of arms of Quebec.

    презентация [506,0 K], добавлен 17.10.2013

  • Анализ динамики экспорта, импорта, внешнеторгового оборота и внешнеторгового баланса страны. Исследование основных торгуемых товаров Германии. Основные партнеры Германии по экспорту/импорту за период 2008-2013 гг. Устойчивость товарной структуры страны.

    курсовая работа [789,8 K], добавлен 02.05.2015

  • The concept of a tsunami as a natural phenomenon, the main reasons for its occurrence, assessment of negative impact on the lives of people and the economy. The shape and height of the waves. Stages of origin and knots in the natural phenomenon.

    презентация [1,9 M], добавлен 13.03.2013

  • Экономико-географическое расположение Индии. Достижения в науке и технологиях. Современное состояние экономики страны, проблемы. Достижения в атомной энергетике. Экспортно-импортная политика в 2002-2007 годах. Национальный доход на душу населения.

    контрольная работа [29,6 K], добавлен 23.01.2015

  • Понятие и состав урбанизации как процесса повышения роли городов в развитии общества. Пространственно-временной анализ динамики уровня урбанизации Азии и его сравнение с регионами мира. Географическое исследование городских агломераций Китая и Индии.

    курсовая работа [4,3 M], добавлен 08.12.2013

  • Понятие урбанизации. Динамика этого процесса в зарубежной Азии 1950–2013 гг., основные факторы, влияющие на него. Сравнение повышения роли городов и распространения городской культуры в развитии Азии с аналогичными явлениями в других регионах мира.

    курсовая работа [2,9 M], добавлен 03.12.2013

  • Кількісні характеристики водяної пари в повітрі. Кругообіг води в природі. Процеси конденсації та сублімації. Утворення туманів та хмар. Парниковий ефект та кислотні дощі. Динаміка зміни температури та опадів по Чернігівській області за 2002-2007 роки.

    дипломная работа [3,6 M], добавлен 20.09.2010

  • Площадь и протяженность территории Германии, пограничные государства страны. Население Федеративной Республики Германия в 2007-2010 годах, иностранные граждане. Пищевая, автомобильная, химическая, легкая отрасль хозяйства, электроэнергетика страны.

    презентация [909,5 K], добавлен 04.04.2012

  • Агропромышленный комплекс (АПК) как важная составная часть экономики страны. Сущность агропромышленного комплекса. Особенности Агропромышленного комплекса Северного Кавказа. Анализ развития АПК Южного федерального округа в первом полугодии 2007 года.

    реферат [33,0 K], добавлен 22.02.2008

  • Понятие, виды и уровни территориального разделения труда. Особенности территориального разделения труда в Российской Федерации и в Чувашской Республике. Прогноз социально-экономического развития Чувашии на 2013 год и на плановый период до 2015 года.

    контрольная работа [646,2 K], добавлен 26.03.2015

  • Географический Северный полюс. Памятные даты освоения Северного полюса. Первая удачная попытка полёта над Северным полюсом в 1926 году экспедиция норвежца Руаля Амундсена на дирижабле "Норвегия". Дрейфующая научная станция "Северный полюс-35" (2007 год).

    реферат [30,9 K], добавлен 26.04.2010

  • Проблемы реструктуризации угледобывающих предприятий. Создание Углекомитета. География угольной промышленности. Прогнозы и задачи угольной промышленности. Научно-техническая и инновационная политика в угольной отрасли. Добыча угля в январе–июле 2007 года.

    реферат [65,3 K], добавлен 28.01.2009

  • Сутність агропромислового комплексу. Особливості Агропромислового комплексу Північного Кавказу. Галузі ринкової спеціалізації. Агропромисловий комплекс Південного федерального округу в першому півріччі 2007 р. Формування нових форм господарювання в АПК.

    реферат [30,8 K], добавлен 14.06.2010

  • Issues about housing prices formation process. Analytical model of housing prices. Definition a type of relationship between the set of independent variables and housing prices. The graph of real housing prices of all Russian regions during the period.

    курсовая работа [1,6 M], добавлен 23.09.2016

  • Strategy of foreign capital regulation in Russia. Russian position in the world market of investments. Problems of foreign investments attraction. Types of measures for attraction of investments. Main aspects of foreign investments attraction policy.

    реферат [20,8 K], добавлен 16.05.2011

  • Types of the software for project management. The reasonability for usage of outsourcing in the implementation of information systems. The efficiency of outsourcing during the process of creating basic project plan of information system implementation.

    реферат [566,4 K], добавлен 14.02.2016

  • Понятие и предмет, виды, объекты экологической экспертизы. Порядок проведения государственной экологической экспертизы. Права и обязанности экспертов. Обзор изменений в законодательстве с 2007 г. по 2013 г. по вопросам воздействия на окружающую среду.

    курсовая работа [631,2 K], добавлен 26.05.2015

  • Основные тенденции социально-экономического развития за период 2007-2013 гг. на основании анализа макроиндикаторов. Социально-экономическое прогнозирование на основании анализа макроиндикаторов. Динамика изменения индекса промышленного производства.

    доклад [264,1 K], добавлен 05.10.2014

  • План проекта настройки сервера для удалённого запуска приложений MS Visio 2007 и MS Project 2007 через RemoteApp. Сбор информации об установленном программном и аппаратном обеспечении; аудит событий безопасности объектов всех серверов с помощью подписок.

    дипломная работа [10,0 M], добавлен 11.09.2012

  • Суть документов 7-ой Рамочной программы Европейского Союза, принятой на период 2007-2013 гг. Цели проектов, финансируемых в рамках приоритетного направления "Перспективные ИКТ", в программе на 2007-2008 гг. Особенности информационной и компьютерной науки.

    реферат [32,1 K], добавлен 01.10.2009

Работы в архивах красиво оформлены согласно требованиям ВУЗов и содержат рисунки, диаграммы, формулы и т.д.
PPT, PPTX и PDF-файлы представлены только в архивах.
Рекомендуем скачать работу.